@lakshveer wrote:
Hi,
I’ve a multivariate time series data for Employee Absenteeism which I want to analyze using Multiple linear regression.
The objective is to to find how much losses every month can we project in 2011 if same trend of absenteeism continues?
I need to find the trend variable which can be included in the equation but I don’t know how exactly can this be achieved.
Data Set.zip (20.4 KB)
Your help will be much appreciated!
Thanks in advance
Posts: 3
Participants: 2